Friday, 15 November 2013

The Haveli- Before Conservation


A rapid visual inspection of the building was undertaken to understand the present condition of the site. For the ease of understanding the issues affecting the built fabric are collaborated as
1.      Structural Issues
2.      Architectural Issues

3.      Issues Related to Services

Differential settlement of the floor slab causing longitudinal crack through the floor



Floor has risen and major cracks are visible along the central axis

Rising damp upto 6 feet was observed in almost all rooms


Major water seepage from the roof corroding the steel sections


No comments:

Post a Comment